Data Center Directory

Celeste Fil d’Ariane

Celeste Fil d’Ariane is an operational data center operated by Celeste in Albi, France. Our footprint estimate of its power is about 6 MW.

Key facts

StatusOperational
OperatorCeleste
Facility power6 MW (range 3 MW to 9.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,014 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asFil d'Ariane
Address1 Rue Pierre gilles de Gennes
Coordinates43.91945, 2.18274
Websiteceleste.fr/hebergement-et-service-cloud/datacenter-fil-dariane

Satellite view

Questions

How much power does Celeste Fil d’Ariane use?

We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.

Who operates Celeste Fil d’Ariane?

Celeste.

Data centers near Albi

More Celeste data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.