Data Center Directory

Cable & Wireless Data Centre

Cable & Wireless Data Centre is an operational data center operated by Cable & Wireless in Canary Wharf, United Kingdom. Our footprint estimate of its power is about 1.3 MW.

Key facts

StatusOperational
OperatorCable & Wireless
Facility power1.3 MW (range 0.7 MW to 2.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 557 m² building outline x 2 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 560 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates51.50201, -0.00912

Satellite view

Questions

How much power does Cable & Wireless Data Centre use?

We estimate the facility power at about 1.3 MW. Estimate from building footprint, low confidence.

Who operates Cable & Wireless Data Centre?

Cable & Wireless.

Data centers near Canary Wharf

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.