Key facts

StatusOperational
OperatorBouygues Télécom
Facility power1.1 MW (range 0.5 MW to 1.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 900 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 470 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.27596, -1.54970

Satellite view

Questions

How much power does Bouygues Télécom data center in La Chapelle-sur-Erdre use?

We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.

Who operates Bouygues Télécom data center in La Chapelle-sur-Erdre?

Bouygues Télécom.

Data centers near La Chapelle-sur-Erdre

More Bouygues Télécom data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.