Borneo A DC
Borneo A DC is an operational data center operated by Ak Bulut Soft in Bishkek, Kyrgyzstan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Ak Bulut Soft |
| Networks | 1 networks PeeringDB. |
| Address | Jukeeva-Pudovkina str. build 110 |
| Coordinates | 42.84324, 74.61586 |
| Website | borneo.kg/colocation.html |
Power and grid
| Grid carbon intensity | 80 g CO₂ per kWh (Kyrgyzstan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 92.9%, coal 5.6%, gas 0.7%, solar 0.6%. Clean power: 93.5% |
Climate and water
| Water stress today | High (40-80%) (Kyrgyzstan) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Borneo A DC?
The grid in Kyrgyzstan emits about 80 g CO₂ per kWh (2025). Largest sources: hydro 92.9%, coal 5.6%, gas 0.7%.
Who operates Borneo A DC?
Ak Bulut Soft.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.