Центр обработки данных "Авантаж"
Центр обработки данных "Авантаж" is an operational data center operated by MTS in Andreyevskoye, Russia. Our footprint estimate of its power is about 2.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | MTS |
| Facility power | 2.8 MW (range 1.1 MW to 7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 23,177 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 55.56790, 37.95684 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Центр обработки данных "Авантаж" use?
We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.
Who operates Центр обработки данных "Авантаж"?
MTS.
Data centers near Andreyevskoye
- SberCloud Christofari 12.4 km · 0.8 MW
- IXcellerate South MOS5 20.0 km · 32 MW
- Data center in Biryulëvo Zapadnoye 20.2 km · 4.8 MW
- Nubes Alto 20.5 km
- DataLine Moscow 2 20.8 km
- IXcellerate MOS5 21.3 km
- BSTelecom 21.8 km
- M1 StackTelecom Datacenter 22.2 km
More MTS data centers
- GreenBushDC Russia
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.