Amazon AWS CPT - Atlantic is an operational data center in Durbanville, South Africa. Our footprint estimate of its power is about 7.4 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 7.4 MW (range 3.7 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,146 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -33.81442, 18.54853 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon AWS CPT - Atlantic use?
We estimate the facility power at about 7.4 MW. Estimate from building footprint, low confidence.
What chips does Amazon AWS CPT - Atlantic use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
Data centers near Durbanville
- Sentech data center in Durbanville 8.0 km
- Teraco CT2 Cape Town, South Africa 15.9 km · 18 MW
- Data center in Kuils River 15.9 km · 25 MW
- OADC CPT3 - Cape Town 16.5 km
- OADC CPT1 - Cape Town 17.4 km
- OADC Rondebosch 17.7 km · 4.8 MW
- Teraco CT1 Cape Town, South Africa 19.0 km
- Africa Data Centres, Cape Town CPT1, South Africa 25.6 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.