Data Center Directory

42-24 Derwent Park

42-24 Derwent Park is an operational data center operated by 42 - 24 in Moonah, Australia. Our footprint estimate of its power is about 0.7 MW.

Key facts

StatusOperational
Operator42 - 24
Facility power0.7 MW (range 0.4 MW to 1.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 624 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Address104 Gormanston Rd
Coordinates-42.83924, 147.29745
Website42-24.com.au

Satellite view

Questions

How much power does 42-24 Derwent Park use?

We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.

Who operates 42-24 Derwent Park?

42 - 24.

Data centers near Moonah

More 42 - 24 data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.